BROWSE EXISTING PROJECTS FROM THE LIST BELOW, LOGIN TO SUBMIT OR EDIT A PROJECT

Can't find a project you own? Click here!

Title Summary Categories Status Updated
Myceliall Solutions Mycoremediation Pollution Solutions. Formerly known as Toadstool Composting. In Progress 08/10/2021
Recreational Land Use Management Plan for the Campus’s Natural Lands Create a sustainable trail network taking into account cultural resources, research, education, sensitive species, erosion and human access In Progress 12/19/2019
DROPS at Bay View Elementary A water sustainability program demonstrated at Bay View Elementary In Progress 06/12/2019
Green Careers Apprenticeship Learning We are creating a curriculum for at-risk high school students at the Natural Bridges Green Center to interest them in green careers. In Progress 02/26/2016
Green Wharf A multi-phase project on the Santa Cruz Municipal Wharf to mitigate the effects of climate change. Completed 02/26/2016
Solar Powered Mobile Recharging Station This project focuses on designing and building of a battery recharging station powered by solar photovoltaic panels. In Progress 02/24/2016
Renewable Energy Assessments The Renewable Energy Assessments project on campus is currently an IDEASS student-led project and has been on-going for two years come. In Progress 02/24/2016
Microgrid Development & Energy User Behavior Development of a next generation distributed microgrid, located in a residential neighborhood near UCSC. In Progress 12/22/2015
Waste to Energy Feasibility Study This Waste to Energy (WtE) Feasibility Study aims to identify the potential for energy generation through waste conversion on campus. Completed 09/04/2015
Digital Storytelling: Outreach and Education Program with Natural Bridges Green Career Center High School students at the Natural Bridges Green Carrer Center (NBGCC) will be involved in gathering digital materials for these narratives In Progress 09/04/2015
GreenWharf: Waste-to-Fuel The goal of our project is to complete a feasibility study on the implementation of a waste to fuel technology on the Santa Cruz Wharf Completed 09/04/2015
Wellness Center Rainwater Harvesting This project consists of a rainwater catchment system that will serve as the primary water source for toilet use at the Wellness Center. Completed 09/04/2015
Santa Cruz Wharf EV Charging Station Project The overall purpose of this project is to install a plug-in electric vehicle charging station on the Santa Cruz Municipal Wharf. Completed 09/04/2015
Central Coast Energy Services A survey aimed at understanding the behavior, beliefs and demographics of the particpants of Central Coast Energy Services (CCES) program. Completed 08/07/2015
Energy Dashboard and Behavior Change Educate dorm residents about how to reduce their energy consumption, specifically carbon emissions, on campus through a mobile application. Completed 08/07/2015

Pages