BROWSE EXISTING PROJECTS FROM THE LIST BELOW, LOGIN TO SUBMIT OR EDIT A PROJECT

Can't find a project you own? Click here!

Campus Organization
Title Summary Categories Statussort descending Updated
UCSC Pathway Lighting replacing the incandescent light bulbs that are currently being used in the “lollipop” fixtures to energy efficient LED light bulbs. In Progress 09/04/2015
AGUA, UCSC Trailer Park Garden Revitalization Our goal as QTPOC is to advance greywater usage and awareness among trailer park residents by revitalizing the land for plant and crop use. In Progress 03/02/2020
Transitioning Landscaping Equipment from Gas Power to Battery Power To transition Grounds' Maintenance power tools from gas to battery power, and eventually get rid of all gas storage at our housing facility. In Progress 03/02/2020
Converting TAPS Maintenance Equipment to Electric To convert existing TAPS Maintenance equipment from gas powered to electric for mowers, trimmers, etc. In Progress 06/14/2021
Crown Merrill Apartment Lamps Replace an aging lighting system from 25+ year old 100 watt floor lamps with 9 watt floor lamps or torchieres. In Progress 03/29/2021
Formula Slug A group of students comprised of different backgrounds build an electric vehicle with a business plan to pitch and compete at a competition. Proposed 04/28/2016
Eco Media Van The Eco-Media-Van houses and transports UCSC filmmakers while making two new documentaries “Water Makes Us Wet” and “Composting is Hot”! Proposed 01/15/2020
The Colleges 9 and 10 Garden Project The Garden serves students by being a welcoming, inclusive space to study, relax and reconnect with Earth and reclaim agricultural knowledge Proposed 06/02/2020
CZ Redwood Grove Bedroom Relamping Replace current light fixtures using CFL with LED fixtures to save energy consumption and waste materials of mercury and ballasts. Proposed 03/29/2021
Rainwater Catchment System The purpose of this project is to create a cost efficient rain catching system on the wharf Proposed 01/15/2020

Pages